What’s been done
Joe
As of July 4th the following has been completed:
1. Auditorium stripped of: seats, sound clouds, wood panels, sound booth, lights, ventilation, theater equipment and catwalk.
2. Work has started on removing stage walls located on the wings and removing portions of the stage to build passarelles.
3. Ceiling has been painted in music room.
4. New lights and ventilation are being worked on in music area.
5. Cafeteria wall has been removed, storage closets are removed, floor tile with asbestos is gone, exterior work for new entry started.
6. History area redesign has been completed and new walls are done and are to the drywalling stage (part of HHS renovations).